However, after repeated difficulties with 'dragging brakes' (which weren't rectified by the removal of a coach at Bangor) the train was terminated on arrival at Rhyl over ninety minutes late. Having shunted the train across to the 'down' platform, 47525 is re-attached to the set after running round in order to return the errant vehicles to Holyhead (11/08/1991)